Coleman Highline

GC  Devcon

Architect   Gensler

Completed  2020 in San Jose

Like all things in Silicon Valley, speed is of the essence — and this was the exact mandate given to AGA for San Jose’s Coleman Highline in 2019. The development features three buildings that were integrated with GFRC panels and given custom paint.

Constructed in efficient time, the design assist only took one month, while the fabrication and assemble glaze process was completed by the summer of 2020. The amenities building of the structure had its own unique challenges, including tall glass that was set with a crane and robotic power cup machine. Overall, there was a five-month shop build duration, and the entire process was completed within 70 days as AGA continues to abide by its standards of quality and excellence when hired for a project.